What a fantastic effort throughout 2024!
The purpose of the scheme is to improve 2km of coastal flood defences in Central Rhyl to protect homes, businesses and the tourist economy from flooding events and coastal erosion well into the future.
The eastern section consists of 1 to 3 tonne rock scour protection to the foundations of the existing defences. The rock is mostly buried beneath the existing beach level and there will be new walkways constructed through the rocks to maintain beach access.
The western section consists of a new stepped revetment, raised and widened promenade and new seawall with improved access via steps and a ramp to the beach.
Current activities:
▪️ PCC rear promenade bullnose walls and stitch beams
▪️ RC insitu rear promenade walls
▪️ PCC revetment installation
▪️ Sheet pile installation for new access ramp
▪️ Access ramp PCC anchor walls and tie-rod system
▪️ 6N filling operations
▪️ Waterproofing to existing walls
▪️ Surface water drainage, insitu revetments at outfalls
A huge well done to the
Balfour Beatty plc
&
D Morgan plc
site team, specialist sub-contractors and the wider supply chain for the progress made to date.